Proposal:
To uprate an exiting 11.5km of 2 wire circuit to 3 wire circuit to upgrade the supply to the local area consisting of rural farms and surrounding properties from The Bold Farm to the village of Sidbury, to include 3 small diversions of existing overhead line requiring 3 additional wood pole supports. The maximum pole height proposed is 11.5m.
Applicant:
Western Power Distribution (West Midlands) Plc